{"id":8817,"date":"2021-06-04T17:38:40","date_gmt":"2021-06-04T16:38:40","guid":{"rendered":"https:\/\/voranews.al\/?p=8817"},"modified":"2021-06-04T17:38:46","modified_gmt":"2021-06-04T16:38:46","slug":"i-hapet-rruge-projektit-te-emaar-ne-portin-e-durresit-qeveria-miraton-vkm-ne-qe-zgjeron-porto-romanon","status":"publish","type":"post","link":"https:\/\/voranews.al\/?p=8817","title":{"rendered":"I hapet rrug\u00eb projektit t\u00eb Emaar n\u00eb Portin e Durr\u00ebsit, Qeveria miraton VKM-n\u00eb, q\u00eb zgjeron Porto Romanon"},"content":{"rendered":"\n<p>Qeveria miratoi nj\u00eb vendim n\u00eb mbledhjen e djeshme q\u00eb i hap rrug\u00eb zbatimit t\u00eb projektit t\u00eb kompanis\u00eb Emaar nga Emiratet Arabe p\u00ebr nd\u00ebrtimin e nj\u00eb porti jahtesh dhe nd\u00ebrtesa luksoze n\u00eb portin e Durr\u00ebsit, duke i dh\u00ebn\u00eb territore t\u00eb reja Portit t\u00eb Porto- Romanos, q\u00eb do t\u00eb mund\u00ebsojn\u00eb zhvendosjen e sh\u00ebrbimeve q\u00eb sot kryhen nga Porti aktual i Durr\u00ebsit n\u00eb Porto Romano.<\/p>\n\n\n\n<p>Sipas vendimit t\u00eb djesh\u00ebm koordinatat e Portit Aktual n\u00eb Porto Romano jan\u00eb shtuar. Zgjerimi i koordinatave krijon mund\u00ebsin\u00eb q\u00eb n\u00eb port do t\u00eb nd\u00ebrtohen disa kalata t\u00eb tjera q\u00eb do t\u00eb sh\u00ebrbejn\u00eb p\u00ebr p\u00ebrpunimin e anijeve t\u00eb mallrave, krahas atij t\u00eb karburanteve q\u00eb kryhet aktualisht.<\/p>\n\n\n\n<p>Nd\u00ebrkoh\u00eb po kryen edhe investime n\u00eb rrug\u00ebn q\u00eb lidh Porto -Romanon me Durr\u00ebsin me nj\u00eb autostrad\u00eb t\u00eb kategoris\u00eb A.<\/p>\n\n\n\n<p>M\u00eb her\u00ebt n\u00eb kulmin e karantin\u00ebs, n\u00eb dat\u00ebn 31 mars 2020 Porti MBP (Multi Buoy Mooring) n\u00eb administrimin e \u201cKastrati Group\u201d q\u00eb realizon sh\u00ebrbimet e p\u00ebrpunimit t\u00eb ngarkesave dhe depozitimit t\u00eb naft\u00ebs n\u00eb Porto Romano mori miratimin p\u00ebr nj\u00eb shtes\u00eb kontrate nga Ministria e infrastruktur\u00ebs dhe Energjis\u00eb.<\/p>\n\n\n\n<p><strong>Projekti i Portit t\u00eb Durr\u00ebsit dhe zhvendosja n\u00eb Porto Romano<\/strong><\/p>\n\n\n\n<p>Kompania EMAAR e Emirateve Arabe propozoi n\u00eb n\u00ebntor t\u00eb vitit t\u00eb kaluar nj\u00eb projekt p\u00ebr t\u00eb zhvilluar Portin e Durr\u00ebsit n\u00eb sh\u00ebrbime t\u00eb dedikuara p\u00ebr turizmin dhe zhvillimin e \u201cReal Estate\u201d n\u00eb nivel luksi, me vler\u00eb 2 miliard\u00eb dollar\u00eb. Por sfida m\u00eb e madhe, q\u00eb \u00ebsht\u00eb p\u00ebrgjegj\u00ebsi e drejtp\u00ebrdrejt\u00eb e qeveris\u00eb shqiptare lidhet me transferimin e p\u00ebrpunimit t\u00eb mallrave nga Durr\u00ebsi n\u00eb Porto Romano.<\/p>\n\n\n\n<p>P\u00ebrpunimi i pasagjer\u00ebve do t\u00eb mbetet n\u00eb Portin e Durr\u00ebsit, nd\u00ebrsa p\u00ebrpunimi i mallrave do t\u00eb b\u00ebhet n\u00eb Porto Romano.<\/p>\n\n\n\n<p>Mir\u00ebpo ekspert\u00ebt t\u00eb fush\u00ebs pohojn\u00eb se zhvendosja e e sh\u00ebrbimit t\u00eb p\u00ebrpunimit t\u00eb mallrave n\u00eb Porto Romano do t\u00eb jet\u00eb nj\u00eb sfid\u00eb. Aktualisht, gjiri i Porto Romanos lidhet me rrjetin komb\u00ebtar me rrug\u00eb automobilistike, e cila ende nuk ka p\u00ebrfunduar totalisht. Zona, e cila synohet t\u00eb akomodoj\u00eb portin m\u00eb t\u00eb madh n\u00eb vend p\u00ebr mallrat, nuk ka linj\u00eb hekurudhore, si n\u00eb Portin e Durr\u00ebsit. Gjithashtu distanca m\u00eb rrjetin komb\u00ebtar \u00ebsht\u00eb m\u00eb e larg\u00ebt dhe mungojn\u00eb disa elemente logjistike themelore.<\/p>\n\n\n\n<p>Infrastruktura n\u00eb Portin e Durr\u00ebsit \u00ebsht\u00eb ngritur nd\u00ebr vite n\u00ebp\u00ebrmjet studimeve dhe investimeve t\u00eb shumta. Nd\u00ebrsa n\u00eb Porto Romano mungon. inxhinier\u00ebt e Portit t\u00eb Durr\u00ebsit i pohuan Monitor pak koh\u00eb m\u00eb par\u00eb se, transferimi nuk mund t\u00eb b\u00ebhet me urdhra t\u00eb momentit, porse duhen studime t\u00eb detajuara dhe shum\u00eb investime q\u00eb k\u00ebrkojn\u00eb koh\u00eb. Transferimi me shpejt\u00ebsi i sh\u00ebrbimit t\u00eb Kargos n\u00eb Porto Romano rrezikon ta b\u00ebj\u00eb Shqip\u00ebrin\u00eb jokonkurruese me rajonin. Kosova q\u00eb tashm\u00eb \u00ebsht\u00eb p\u00ebrdoruesi kryesor n\u00eb rajon i Portit t\u00eb Durr\u00ebsit me nd\u00ebrtimin e Autostrad\u00ebs s\u00eb re me Maqedonin\u00eb arrin m\u00eb shpejt n\u00eb Portin e Selanikut.<\/p>\n\n\n\n<p>P\u00ebrpjekjet p\u00ebr t\u00eb transferuar sh\u00ebrbimin e kargos nga Porti i Durr\u00ebsit kan\u00eb d\u00ebshtuar m\u00eb her\u00ebt. Studimet q\u00eb nga viti 2000 kan\u00eb v\u00ebrtetuar se, zgjerimi i Portit t\u00eb Durr\u00ebsit p\u00ebr t\u00eb p\u00ebrpunuar m\u00eb shum\u00eb mallra n\u00eb perspektiv\u00eb \u00ebsht\u00eb i pamundur p\u00ebr shkak t\u00eb munges\u00ebs s\u00eb hap\u00ebsirave. Porti, brenda n\u00eb qytet, \u00ebsht\u00eb i rrethuar me nd\u00ebrtime dhe p\u00ebr m\u00eb tep\u00ebr deti \u00ebsht\u00eb shum\u00eb i cek\u00ebt q\u00eb nuk siguron ankorimin e anijeve me tonazh t\u00eb lart\u00eb.<\/p>\n\n\n\n<p>P\u00ebr rrjedhoj\u00eb, transferimi i sh\u00ebrbimeve t\u00eb kargos u synua edhe nga qeveria e zotit Berisha. N\u00eb vitin 2011, Agjencia Shqiptare e investimeve ftoi investitor\u00ebt t\u00eb shnd\u00ebrronin Porto Romanon n\u00eb nj\u00eb port p\u00ebr p\u00ebrpunimin e mallrave s\u00eb bashku me zhvillimin e zon\u00ebs ekonomike t\u00eb Spitall\u00ebs kundrejt nj\u00eb investimi prej 800 milion\u00eb eurosh. Por kriza globale e pas vitit 2008 pengoi interesin e investitor\u00ebve potencial\u00eb.<\/p>\n\n\n\n<p>Marr\u00eb nga Monitor.al<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Qeveria miratoi nj\u00eb vendim n\u00eb mbledhjen e djeshme q\u00eb i hap rrug\u00eb zbatimit t\u00eb projektit t\u00eb kompanis\u00eb Emaar nga Emiratet Arabe p\u00ebr nd\u00ebrtimin e nj\u00eb porti jahtesh dhe nd\u00ebrtesa luksoze n\u00eb portin e Durr\u00ebsit, duke i dh\u00ebn\u00eb territore t\u00eb reja Portit t\u00eb Porto- Romanos, q\u00eb do t\u00eb mund\u00ebsojn\u00eb zhvendosjen e sh\u00ebrbimeve q\u00eb sot kryhen nga &hellip;<\/p>\n","protected":false},"author":1,"featured_media":8818,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[4],"tags":[],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/voranews.al\/wp-content\/uploads\/2021\/06\/10BE696B-1303-4115-81AE-578461FC42F2.jpeg","_links":{"self":[{"href":"https:\/\/voranews.al\/index.php?rest_route=\/wp\/v2\/posts\/8817"}],"collection":[{"href":"https:\/\/voranews.al\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/voranews.al\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/voranews.al\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/voranews.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8817"}],"version-history":[{"count":1,"href":"https:\/\/voranews.al\/index.php?rest_route=\/wp\/v2\/posts\/8817\/revisions"}],"predecessor-version":[{"id":8819,"href":"https:\/\/voranews.al\/index.php?rest_route=\/wp\/v2\/posts\/8817\/revisions\/8819"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/voranews.al\/index.php?rest_route=\/wp\/v2\/media\/8818"}],"wp:attachment":[{"href":"https:\/\/voranews.al\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8817"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/voranews.al\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8817"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/voranews.al\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}